UCI Palo Verde Dormitory Housing

Location: Irvine, California
Client: UCI

 

Project Elements

  • 20-Acre, 400-Unit Student Housing
  • Design-Build LEED-Certified Project
  • Civil Engineering Design and Survey Services
  • Topographic Survey
  • Construction Survey
  • On-Site Grading
  • Drainage
  • Water
  • Sewer
  • Storm Drain
  • Dry Utilities
  • Relocation of Existing utilities
  • Demolition Plans
  • Construction Engineering Support
  • Approvals from DSA

Description:

PENCO was retained to provide civil engineering design and survey services for this 20-acre, 400-unit student housing, Design-Build LEED-certified project on the University of California, Irvine Campus.

Services included topographic survey, construction survey, design for on-site grading, drainage, water, sewer, storm drain, dry utilities, relocation of existing utilities, and demolition plans.

The Design-Build delivery method required fast track design and construction engineering support.

Approvals were received through the Division of the State Architect.

We’re pleased to announce that we merged with Cannon on August 1, 2018.

As we fully transition into the Cannon family, our website will redirect visitors to our parent company, Cannon Corporation’s, website, www.cannoncorp.us. If you’d like to find out more about the merger, read about it in this press release.