Rancho Mira Monte

Name: Rancho Mira Monte
Location: Chino, California
Client: Trumark

 

Project Highlights

  • Planning & Site Plan Studies
  • 271-Acre Site
  • 823 Total Residential Lots
  • 11 residential neighborhoods
  • 41 local streets, 41 alleys
  • Street Improvement Plans
  • Entitlement
  • Mass Grading Plan
  • Rough Grading
  • Earthwork Calculations
  • Water Improvement Plans
  • Reclaimed Water Plans
  • Sewer Improvement Plans
  • Storm Drain Improvement Plans
  • SWPPP
  • Water Quality Management Plan
  • Traffic Striping and Signage
  • Hydrology
  • Hydraulic Calculations
  • Underground Utility Plans
  • Equestrian Trails

Description:

PENCO prepared off-site infrastructure for domestic/reclaimed water, sewer, storm drain and street improvements. We also provided Domestic / Reclaimed Water Improvement Plans for the proposed water systems, Sewer Improvement Plans for the proposed sewer system, and Storm Drain Improvement Plans for the proposed storm drain system serving the development in full conformance with the City of Chino and County of Riverside Standards.

PENCO provided street improvement plans for the on-site streets based on the standards of the City of Chino. We also prepared traffic and signing plans for the proposed street within the development, as part of the street improvement plans, in full compliance with the City’s requirements.

PENCO prepared hydrology/hydraulic calculations for this Project, to be in compliance with the City of Chino standards and drainage design criteria for the approval of a preliminary WQMP during the entitlement process.

PENCO is assisting with site plan studies during the planning process that will lead to a tentative map approval during entitlement. PENCO will also prepare all “B” level maps and on-site improvement plans.