Home Depot

Location: Fontana, California
Client: Home Depot

 

Project Elements

  • 12-Acre Retail Site for Home Depot and two Tenants
  • Civil Engineering Design and Survey Services
  • Detention Basin and Temporary Septic Tank
  • Off-Site Street and Storm Drain Improvements
  • Storm Water Quality CDS Filtration System
  • Fast-Track Project Completed on Schedule
  • Processing of Plans through the City of Fontana

Description:

The project involves a 12-acre site for Home Depot and two additional tenants.

PENCO provided civil engineering design and survey services including precise grading plans, on-site utility plan, and off-site improvements. Other services included construction stalking and construction engineering support.

PENCO designed a detention basin and temporary septic tank, as well as off-site street and storm drain improvements.

As part of the on-site storm drain design, PENCO prepared a storm water quality CDS filtration system to treat the storm water before entering the public storm drain.

This fast-track project required processing through the City of Fontana and was completed on schedule.