Home Depot

Location: Fontana, California
Client: Home Depot

 

Project Elements

  • 12-Acre Retail Site for Home Depot and two Tenants
  • Civil Engineering Design and Survey Services
  • Detention Basin and Temporary Septic Tank
  • Off-Site Street and Storm Drain Improvements
  • Storm Water Quality CDS Filtration System
  • Fast-Track Project Completed on Schedule
  • Processing of Plans through the City of Fontana

Description:

The project involves a 12-acre site for Home Depot and two additional tenants.

PENCO provided civil engineering design and survey services including precise grading plans, on-site utility plan, and off-site improvements. Other services included construction stalking and construction engineering support.

PENCO designed a detention basin and temporary septic tank, as well as off-site street and storm drain improvements.

As part of the on-site storm drain design, PENCO prepared a storm water quality CDS filtration system to treat the storm water before entering the public storm drain.

This fast-track project required processing through the City of Fontana and was completed on schedule.

 

 

 

We’re pleased to announce that we merged with Cannon on August 1, 2018.

As we fully transition into the Cannon family, our website will redirect visitors to our parent company, Cannon Corporation’s, website, www.cannoncorp.us. If you’d like to find out more about the merger, read about it in this press release.