Allergan Corporate Headquarters

Location: Irvine, California
Client: Allergan

 

Project Elements

  • Civil Engineering Design and Survey Services
  • Drainage Design and Hydrology Study
  • Topographic Design and Construction Staking
  • Major Site Utility Corridor for Wet and Dry Utilities
  • Approvals through City of Irvine and Irvine Ranch Water District (IRWD)

 

Description:

PENCO provided civil engineering planning and design and survey services for this
22-acre medical research facility renovation and a new administration facility building.

Work included on-site preliminary planning and engineering for grading, utilities, demolition of some existing buildings, relocation of buildings, drainage design, and hydrology study.

PENCO prepared a major on-site utility corridor design, including all hot water, chilled water, domestic water, and dry utilities. PENCO was able to meet the client’s challenging design for installation for all on-site utilities in a very narrow corridor.

PENCO also provided survey services including on-site topographic design and construction staking.

The project was processed and approved through the City of Irvine and Irvine Ranch Water District (IRWD).

 

We’re pleased to announce that we merged with Cannon on August 1, 2018.

As we fully transition into the Cannon family, our website will redirect visitors to our parent company, Cannon Corporation’s, website, www.cannoncorp.us. If you’d like to find out more about the merger, read about it in this press release.